Please use this identifier to cite or link to this item:
http://www.ptolomeo.unam.mx:8080/xmlui/handle/132.248.52.100/14070
Title: | INSTALACIÓN ELÉCTRICA INDUSTRIAL PARA AMPLIACIÓN DE TORRE DE ENFRIAMIENTO, REFINERÍA FRANCISCO I. MADERO. |
Authors: | Lima Gómez, Angel Isaías |
Keywords: | INSTALACIÓN ELÉCTRICA INDUSTRIAL PARA AMPLIACIÓN DE TORRE DE ENFRIAMIENTO, REFINERÍA FRANCISCO I. MADERO. |
Issue Date: | 2017 |
Abstract: | INSTALACIÓN ELÉCTRICA INDUSTRIAL PARA AMPLIACIÓN DE TORRE DE ENFRIAMIENTO, REFINERÍA FRANCISCO I. MADERO. |
URI: | http://132.248.52.100:8080/xmlui/handle/132.248.52.100/14070 |
Appears in Collections: | Tesina o Trabajo Final Maestría 2017 |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
tesina especialidad ALG 12-11-2017.pdf | 5.53 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.